| Ministry/Division |
: |
Ministry of Industries |
| Agency |
: |
Bangladesh Chemical Industries Corporation (BCIC) |
| Procuring Entity Name |
: |
Bangladesh Chemical Industries Corporation (BCIC). |
| Procuring Entity Code |
: |
|
| Procuring Entity District |
: |
Dhaka |
| Expression of Interest for Selection of |
: |
Consulting Firm (International) (Lump-Sump) |
| Title Of Service |
: |
Techno-Economic Feasibility Study on SETTING UP A NEW FACTORY INTREGATED PAPER/ STARCH/ API COMPLEX AT KNM PREMISES, KHALISHPUR, KHULNA. |
| EOI Ref. No. |
: |
36.01.0000.271.14.710.19 |
| Date |
: |
15/03/2021 |
KEY INFORMATION
|
| Procurement Sub-Method |
: |
Quality and Cost Based Selection(QCBS) |
FUNDING INFORMATION
|
| Budget and Source of Funds |
: |
Own Funds Own Funds |
| Development Partners |
: |
|
PARTICULAR INFORMATION
|
| Project/Programme Name |
: |
|
| EOI Closing Date and Time |
: |
05/05/2021 12.00 Noon (BST)
|
| Publication Date |
: |
15/03/2021
|
INFORMATION FOR APPLICANT
|
| Brief Description of Assignment |
: |
BCIC has planned on “SETTING UP A NEW FACTORY INTREGATED PAPER/ STARCH/ API COMPLEX AT KNM PREMISES, KHALISHPUR, KHULNA.
To ensure and perform the above mentioned activities, BCIC would like to appoint an international reputed and experienced Consulting Firm.
Consultant’s responsibilities/ assignment include, but not limited to, the following:
To make a techno –economic feasibility report on incorporating all Utilities, Auxiliaries and Offsite required by the complex include but not limited to,
A.1 To determine the availability of land within KNM boundary limit and all its auxiliary facilities. Plot plan and lay-out need to be submitted.
A.2 To determine the size of a new factory as requirements of Bangladesh
A-3 To study the Environmental Impact Assessment (EIA) and to suggest its Environmental Management Procedures (EMP) providing Rehabilitation Action Program (RAP) through adjusting/ incorporating all dozing/ filtration system considering the effluent volume/ quantity irrespective of solid, liquid, gaseous pollutants/ exhaust abiding DoE Rules and Regulations of Bangladesh.
A-4. To evaluate all Utilities, Auxiliaries and Offsite required by the complex include but not limited to: Water Intake, Water Treatment System, Demineralized Water System, Cooling Water System, Steam and Power Generation System, Instrument and Plant Air System, Distribution System for Water , Steam and Power; Raw material storage, Loading and Unloading infrastructure facilities of existing Product Dispatch System ( Track/ Rail), Fire Fighting Facility and any other offsite facilities required for normal operation of the plant safely.
A-5 To evaluate the economic viability of proposed project considering availability of imported raw materials, distribution of finished and intermediary product and Health, Safety and Environment (HSE) issue.
|
| Experience, Resources and Delivery Capacity Required |
: |
Experience
16.1 Background of Firm(s) with detailed brochure to be submitted along with authentic document and proof of each credit criteria (any statement without such evidencing documents will be of no use) mentioning their facilities and areas of expertise.
16.2 Minimum 05 (Five) years’ experience in Preparation of Techno Economic Feasibility Study Report and Related Documentation each of big category Integrated paper mill/ Starch / API Complex.
16.3 Having experience as Consulting Firm for preparing Techno Economy Feasibility Report of at least 1(One) big category each of Integrated paper/ starch/ API Complex in last 05 (Five) years; years counting backward from the date of publication of EoI Notice.
16.4 Overseas experience as consulting firm at least 1 (One) big category each of Integrated paper/ starch/ API complex for the last 5 (Five) years; years counting backward from the date of publication of EoI Notice.
Resources and Delivery Capacity Required
16.5 Availability of appropriate experienced and professionally qualified persons / experts among the staff and resources to carry out the assignment (CV of each experts must be submitted).
16.6 Having average annual financial turnover of USD 1 (One) million for last 3 (three) years; years counting backward from the date of publication of EoI Notice.
16.7 List of the experts (integrated paper/ starch/ API Complex) and staff with qualification.
16.8 As such reputed international firms are hereby invited to submit proposals completing as per following Prescribed EoI Format.
|
| Other Details (if applicable) |
: |
|
| Association with foreign firms is |
: |
Not Applicable |
| Eoi Detail Information |
| Ref No |
Phasing Of Services |
Location |
Start Date |
Completion Date |
| S1 |
Single Phase |
KNM site, Khalishpur, Khulna. |
October 2021 |
December 2021 |
|
PROCURING ENTITY DETAILS
|
| Name of Official Inviting EOI |
: |
Md. Niaz Abdul Kader |
| Designation of Official Inviting EOI |
: |
Deputy Chief Engineer (Chemical), Planning Division, BCIC. |
| Address of Official Inviting EOI |
: |
Planning Division, 15th Floor, BCIC Bhaban,
30-31 Dilkusha C/A,
Dhaka-1000, Bangladesh.
|
| Contact details of Official Inviting EOI |
: |
Phone : 88-02-9567088, Fax : 880-9564120, Email : niaz.pb@gmail.com |
Advertisement Corrigendum(s) |
Date Of Corrigendum |
: |
01/05/2021 |
| Brief Description |
: |
Setting up a new factory intregated paper/starch/API Complex at KNM premises, Khulna. |
| Other Information |
: |
Pre bid meeting will be held on 20.05.2021 instead of 26/04/2021. |
| Last Date Of Submission |
: |
27/05/2021 |
| Last Time Of Submission |
: |
12.00 BST |
| Status |
: |
Active |
Date Of Corrigendum |
: |
23/06/2021 |
| Brief Description |
: |
“SETTING UP A NEW FACTORY INTREGATED PAPER/ STARCH/ API COMPLEX AT KNM PREMISES, KHALISHPUR, KHULNA. |
| Duration |
: |
From October 2021 to December 2021 |
| Other Information |
: |
For terms of reference (TOR), qualification, criteria & other conditions, please refer to detailed EOI Notice which will be available for purchase from the office of Controller of Accounts. BCIC Bhaban (6th floor) 30-31, Dilkusha C/A, Dhaka- 1000, Bangladesh during office hour on payment of BDT 1500 equivalent to USD 20 (Non-Refundable) from 15th March 2021 to its closing schedule 12th August 2021. |
| Last Date Of Submission |
: |
12/08/2021 |
| Last Time Of Submission |
: |
12.00 Noon (BST) |
| Status |
: |
Active |
|
| The procuring entity reserves the right to accept or reject all tenders |