| 1 |
Ministry of Industries
Bangladesh Sugar and Food Industries Corporation (BSFIC)
|
36.04.0000.035.07.027.2026.210 dated-04-08-2026
Notification of Award
|
Supply of Cold Finished Seamless carbon steel boiler tubes, Cold finished seamless carbon steel boiler sugar heater tubes and cold finished ERW carbon steel tube for air pre heater of boiler of sugar mills |
Chamb Engergy Technology Co., Ltd |
109 Dongcang north road, Taicang, Jiangsu Province
China-215400 |
06/08/2026 |
|
| 2 |
Prime Minister’s Office
Bangladesh Economic Zone Authority
|
03.07.0000.056.099.324.26-4476 Dt. 12/07/206
IC3-NSEZ-BEZA
|
PPP Senior Advisor |
Nazrul Islam |
Flat F6, House 41
Road No. 5, Dhanmondi
Dhaka, Bangladesh |
03/08/2026 |
|
| 3 |
Ministry of Road Transport and Bridges
Roads & Highways Department (RHD)
|
35.01.2607.079.35.001.26.163
NGO Services for implementing "Resettlement Plan" for Chattogram-Cox's Bazar Highway Improvement Project (I)
|
The NGO shall primarily assist the PIU in RAP and LA, assisting APs and EPs for receiving compensation from DC offices, as per RAP. The general scope and key tasks shall include but not limited to:
1. Review, Update, Finalization and Implementation of RAP.
2. Assist in collecting CCL; from DC offices.
3. Assist in LA and utility shifting activities, provide support during the survey/ field verification conducted by DC office and other government organizations.
4. The INGO will carry out, where needed, additional census and IOL if required.
5. Assist in collection and computerization of DC office data (calculation sheet, DC Award, share determination etc);
6. Disseminate of information on the project and resettlement policy to the PAPs and others (community groups, local administration, etc.).
7. Identification of EPs and render assistance to EPs to participate in GRC; preparation of EP file, entitlement card, payment statement etc.
8. Assistance to APs for implementation of the IRP Programme and resettlement process.
9. Disbursement of resettlement benefits.
10. Participation of Women’s Groups in Resettlement Process.
11. Preparation of monitoring and supervision reports to EA.
12. Prepare supplementary LAP during implementation for any “left out” land/plots or disputed area required for project implementation.
13. Submission of PCR and detailed statement of expenditure against payment to the APs and EPs.
14. Assist EA in awareness building programme on Gender Issues, prevention of STI/HIV/AIDS & Human Trafficking.
15. Perform specific supplementary tasks relevant to social and resettlement issues as per direction and instruction of the Consultant |
Knowledge Management Consultants (KMC) Ltd. |
JA- 147, Flat- 4/A, Wireless Gate,
Mohakhali, Dhaka- 1213 |
02/08/2026 |
|
| 4 |
Ministry of Road Transport and Bridges
Roads & Highways Department (RHD)
|
e-GP-101/EE/BRD/OTM/2025-2026.
Estimate for Boundary Wall of Shakpala Park under Road Division, Bogura, during the year 2025-2026.
|
Estimate for Boundary Wall of Shakpala Park under Road Division, Bogura, during the year 2025-2026. |
M/S. Shefat International |
Chamagram Baroghoria Chapai Nawabganj Sadar Chapainawabganj |
02/08/2026 |
|
| 5 |
Ministry of Energy, Power and Minearal Resources
The Coal Power Generation Company Bangladesh Limited (CPGCBL)
|
Invitation/PPS Ref. No: 27.32.0000.000.020.55.0001.25.0312; Date: 02/04/2026
Supply of Lube Oil & Grease for different departments at Matarbari Coal Fired Power Plant
|
Procurement Method: National (Direct Procurement Method-DPM) |
Jamuna Oil PLC. |
Jamuna Bhaban, Agrabad C/A, Chattogram-4100 |
26/07/2026 |
|
| 6 |
Ministry of Shipping
Mongla Port Authority
|
18.14.0158.412.07.016.2026
Procurement of AC for the office of the Senior Audit Officer of Mongla Port Authority
|
Procurement of AC for the office of the Senior Audit Officer of Mongla Port Authority |
N Haque Engineering And Construction |
Munjitpur, Satkhira |
26/07/2026 |
|
| 7 |
Ministry of Energy, Power and Minearal Resources
Rural Electrification Board (REB)
|
27.12.2672.184.02.015.26.1144
Drawing, Design, Supply, Installation, Testing & Commissioning for Upgradation of Tannery-3, 33/11kV Indoor Sub-Station from 20/28 MVA to 30/42 MVA of Under Dhaka PBS-3.
|
Turn-key contract for Drawing, Design, Supply, Installation, Testing & Commissioning for Upgradation of Tannery-3, 33/11kV Indoor Sub-Station from 20/28 MVA to 30/42 MVA Under Dhaka PBS-3 |
MM Enterprise |
House-21/1/Ka, Road no.: 06
North Adabor, Dhaka-1207, Bangladesh.
|
26/07/2026 |
|
| 8 |
Ministry of Energy, Power and Minearal Resources
Rural Electrification Board (REB)
|
27.12.2672.184.02.015.26.72
Drawing, Design, Supply, Installation, Testing & Commissioning for Upgradation of Nayarhat, 33/11kV Indoor Sub-Station from 20/28 MVA to 30/42 MVA Under Dhaka PBS-3
|
Turn-key contract for Drawing, Design, Supply, Installation, Testing & Commissioning for Upgradation of Nayarhat, 33/11kV Indoor Sub-Station from 20/28 MVA to 30/42 MVA Under Dhaka PBS-3 |
PSDC-BDP-MAC-JV |
Nahar Plaza (Suite:701-2), 26 Sonargaon Road, Hatipul, Dhaka-1000. |
26/07/2026 |
|
| 9 |
Ministry of Shipping
Mongla Port Authority
|
18.14.0158.424.007.2408.2024
Works
|
Repair and Maintenance of Internal plaster, door-window repair, painting, distempering, exchange sanitary fitting-fixing works of flat no. Dormitory-3/7, 4/2 and G-21/3, 21/4, 23/8, 27/3, H-22/5 total 7 flats in Maloti residential area of Mongla Port Authority. |
PEU ENTERPRISE |
TARASHI,KOTALIPARA,GOPALGANJ |
22/07/2026 |
|
| 10 |
Ministry of Social Welfare
Ministry of Social Welfare
|
41.06.0000.001.010.001.26.367
-
|
- |
Aristo Accessories Industries, |
Mishrail, Siddhirganj, Narayanganj |
21/07/2026 |
|