1421 |
Ministry of Energy, Power and Minearal Resources
Bangladesh Gas Fields Company Limited
|
IFB No. 28.10.1213.901.02.012.20(PKG-1)/(R) Dated 16.03.2020
Project Name: Natural Gas Infrastructure and Efficiency Improvement Project, Part A: Installation of Wellhead Compressors at Location-A of Titas Gas Field
|
Package: Procurement of design, engineering, supply, installation, testing, commissioning and operation of 07 nos. of Wellhead Compressors (each having capacity of 60 MMSCFD) with associated equipment & facilities at Location-A of Titas Gas Field |
Dorsch International Consultants GmbH, Germany (Lead) in association with Dorsch Consults (India) Private Limited, India (JV Partner) and LNG CONtech Ltd., Bangladesh (Sub-consultant to Dorsch Consult India Pvt. Ltd.) |
Landsberger Strasse 368 Munich 80687, Germany |
04/11/2020 |
|
1422 |
Ministry of Energy, Power and Minearal Resources
Bangladesh Power Development Board
|
27.11.0000.304.20.359.20.1066
Notification of Award
|
Procurement of Safety Spare Parts for Engines and Day to Day Maintenance & Unscheduled/Breakdown Maintenance Works (Lot-1) & Procurement of Hardware & Upgradation of existing WOIS with Server Based WOIS (sWOIS) (Lot-2) of Hathazari 100MW Peaking Power Plant, BPDB, Hathazari, Chattogram, Bangladesh |
M/S Weber Power Solutions Ltd. |
28/D, (1st Floor), Shegun Bagicha,
Dhaka-1000, Bangladesh. |
03/11/2020 |
|
1423 |
Ministry of Energy, Power and Minearal Resources
Bangladesh Power Development Board
|
27.11.0000.304.20.359.20.1067
Notification of Award
|
Procurement of Safety Spare Parts for Engines and Day to Day Maintenance & Unscheduled/Breakdown Maintenance Works (Lot-1) & Procurement of Hardware & Upgradation of existing WOIS with Server Based WOIS (sWOIS) (Lot-2) of Hathazari 100MW Peaking Power Plant, BPDB, Hathazari, Chattogram, Bangladesh |
The Civil Engineers Ltd. |
69, Maakhakhali C/A
Dhaka-1212, Bangladesh |
03/11/2020 |
|
1424 |
Ministry of Housing and Public Works
Rajdhani Unnayan Kartripakkha (RAJUK)
|
URP/RAJUK/W-1
Construction of 10 Storied plus 2 Basements Office Building with Research, Training and Testing Laboratory Facilities for Urban Resilience Unit, RAJUK
|
The Structural System of the building’s superstructure mainly comprises of Steel Frame with Steel Deck and Concrete Core. Main Components of the Works: Part A: General Site Facilities, Part B: Civil Works (including Steel Works), Part C: Sanitary, Plumbing & Water Supply Works, Part D: Electro-Mechanical Works (comprises with D-1: Internal Electrification Works, D-2: Passenger Lift, D-3: CCTV & PA System, D-4: Networking System, D-5: Access Control System, D-6: Telephone System, D-7: 1250 KVA Sub-Station, D-8: 630 KVA Diesel Generator, D-9: Fire Detection System, D-10: Fire Protection System, D-11: Fire Separation Doors, D-12: On-Line UPS, D-13: Supply, Installation, Testing & Commissioning of HVAC System, D-14: Car Parking System & D-15: Integrated Building Management System (IBMS)) and Part E: Environmental Monitoring. Duration of Works Completion: 18 Months from the date of Commencement of Works |
China State Construction Engineering Corporation Ltd. |
Address-1: No. 15, San Li He Road, Haidian District, Beijing, China
Address-2: House-4, Road-6, Baridhara, Dhaka, Bangladesh |
02/11/2020 |
|
1425 |
Ministry of Energy, Power and Minearal Resources
Bangladesh Power Development Board
|
27.11.0000.304.20.357.20.790
Notification of Award
|
Procurement of Safety Spare Parts and Day to Day Maintenance & Unscheduled Maintenance Expert Works for Titas 50 MW Peaking Power Plant, BPDB, Titas, Cumilla, Bangladesh. |
Versute Engineering Limited |
House # 02, Road # 06, Sector # 07,
Uttara, Dhaka. |
28/10/2020 |
|
1426 |
Ministry of Energy, Power and Minearal Resources
Bangladesh Power Development Board
|
27.11.0000.304.20.349.20.745
Notification of Award
|
Supply, Installation, Testing & Commissioning of Field Instruments and DCS for Water Treatment Plant for Chandpur 150 MW CCPP,BPDB, Chandpur. |
UAB ARIONEX LT |
Asigalio Street 6D, Kaunas.
LT-49142, Lithuania |
28/10/2020 |
|
1427 |
Ministry of Energy, Power and Minearal Resources
Karnaphuli Gas Distribution Company Limited
|
28.15.0000.211.51.008.20-365
Notification of Award
|
Procurement of Different sizes & capacities of 825 Nos. Diaphragm Gas Meter for Karnaphuli Gas Distribution Company Limited, Chattogram, Bangladesh. |
M/s. ITRON GLOBAL TRADING |
2111 North Molter Road, Liberty Lake, WA 99019, United States of America. |
28/10/2020 |
|
1428 |
Ministry of Finance
Insurance Development and Regulatory Authority
|
No. 53.03.0000.090.41.003.19-347 Date: 18-10-2020
Notification of Award (NoA) for the assignment of Review of IT Requirements and Implementation Support– Firm (Package no.: S13-3-1)
|
Technohaven Company Ltd., Bangladesh has been finally selected for the assignment of “Review of IT Requirements and Implementation Support– Firm” for 24 months |
M/s Technohaven Company Ltd. |
70 Green Road, Fattah Plaza-9th Floor
Dhaka-1205
|
27/10/2020 |
|
1429 |
Ministry of Health and Family Welfare
Directorate General of Family Planning
|
DGFP/IEM/SP-1(Call Centre)/67/2020/1375 Date 19/10/2020
Letter of Acceptance
|
Selection of Service Provider Firm for 21 months Voice based helpline Centre (Shukhi Pariber Call Centre) (services & maintenance). |
Synesis IT Ltd., |
Level-2 & 3, BDBL Bhaban, 12, Kawran Bazar, Dhaka. |
25/10/2020 |
|
1430 |
Ministry of Local Government, Rural Development and Co-operatives
Local Government Engineering Department (LGED)
|
46.02.69000.000.14.099.20-803, Dated 30-09-2020
Tender ID 415778
|
Package No.: CW-49.(a)/RCIP/NTR
Section A: Improvement/Construction of Road works: Improvement of Rajapur GC - Jonail GC at Ch.00m to 18180m under Baraigram Upazila, District : Natore.(Road ID 169152002). (Total Cost of Salvaged Materials Tk. 1,09,635.00) Section B: Maintenance works-5 - years Maintenance works of all the above roads. |
Mohd. Shohidul Islam |
Executive Engineer
Office of The Executive Engineer, LGED, Natore. |
20/10/2020 |
|