| 961 |
12.06.0000.241.40.300.25-1786
|
General Manager (Fertilizer Management). |
12/08/2025 |
03/09/2025
12:00 PM
|
Dhaka |
| 962 |
12.06.0000.241.40.301.25-1790
|
General Manager (Fertilizer Management). |
12/08/2025 |
03/09/2025
12:00 PM
|
Dhaka |
| 963 |
Construction of 6" dia x 1.5 km x 350 psig high pressure gas Pipeline at Rajshahi BSCIC Industrial Area-2
28.18.0000.000.047.35.001.25-Rajshahi BSCIC 1.5km
|
General Manager (Planning & Development), PGCL |
13/08/2025 |
04/09/2025
12:00 PM
|
Sirajganj |
| 964 |
Construction of the Department of Military Lands and Cantonments and MEO Central Circle, Dhaka office complex.
23.22.0000.027.14.005.24.216
|
Project Director, "Construction of the Department of Military Lands and Cantonments and MFO Central Circle, Dhaka office complex." Project |
11/08/2025 |
28/08/2025
12:00 PM
|
Dhaka |
| 965 |
Flight Inspection (Routine/commissioning) and Calibration of Radio Navigational, Visual and RNAV (GNSS) facilities / RNP Approach Procedure /Procedure Design Validation at different Airports of Bangladesh.
30.31.0000.121.07.0028.21.100 Date-28/7/2025
|
Office of the Executive Director (CEMSU) |
28/07/2025 |
10/09/2025
12:00 PM
|
Dhaka |
| 966 |
Part-A: Estimate For the Laying of 1-400 mm dia uPVC Buried Pipe Main Line Exiting pipe end point to khander pond (Ch. 1+650 Km to Ch. 3+050 Km, Length=1400m) with Ancillary Works. Part-B: Estimate For the Laying of 1-280 mm dia uPVC Buried Pipe, Main Line Ch.2+300 Km Gusiya to Gholar Patal (North Side, Ch. 0+00km to ch. 0 +460km, Length=460m); Main line ch. Ch. 2+300 Km, Gusiya to Sona tala (South side, Ch. 0-+000km to Ch. 0+320km, Length-320m); Main Line Ch. 2+550km, Tipapara to Khashkander (North side Ch. 0+000km to Ch. 0+920km, Length= 920m); Main line Ch.2+55Okm, Tipapara to Boropukuria (South side Ch. 0+000km to Ch. 0+460km Length=460m) (Total Length= 2160m) with Ancillary Works. Part-C: Estimate For the Laying of 1-250mm dia uPVC Buried Pipe Bathandanga Deep To Gorosthan low land ( Ch. 0+650 Km to Ch. 1+250 Km, Length=600m) with Ancillary Works Furniture Supply And Window Fitting of WMCA office. Under Mohadanga Panna Beel Sub-Project (SP No: 44087) Under Sadar Upazila, Dist: Chapainawabganj.
APP ID-214790
|
Executive Engineer, LGED, Chapainawabganj |
03/07/2025 |
26/08/2025
11:00 PM
|
Chapai Nawabganj |
| 967 |
Construction of Vertical Extension (1st, 2nd & 3rd floor) of Existing Single Storied Academic Building with Four Storied Foundation in/c. Sanitary, Water supply & Electrification Works at Dewan Abdur Rahim BL High School and College, Balaganj, Sylhet. (FY: 2022-23)
37.07.0000.014.20.101.23-3198(21)
|
Office of the Executive Engineer, Education Engineering Department, Sylhet |
19/11/2023 |
21/08/2025
12:00 PM
|
Sylhet |
| 968 |
Construction of Single Storey Academic Building with 4-Storied Foundation in/c. Sanitary, Water Supply & Electrification Works with Pile Foundation at Noorjahan Memorial Womens Degree College, Sadar, Sylhet. (FY: 2021-22)
37.07.0000.014.20.101.23-2929(2)
|
Office of the Executive Engineer, Education Engineering Department, Sylhet |
19/09/2023 |
21/08/2025
12:00 PM
|
Sylhet |
| 969 |
Construction of Single Storey Academic Building with 4-Storied Foundation in/c. Sanitary, Water Supply & Electrification Works at Syed Hatim Ali High School, Sadar, Sylhet. (FY: 2021-22)
37.07.0000.014.20.101.23-2854(13)
|
Office of the Executive Engineer, Education Engineering Department, Sylhet |
11/09/2023 |
21/08/2025
12:00 PM
|
Sylhet |
| 970 |
Construction of Single Storey Academic Building with 4-Storied Foundation in/c. Sanitary, Water Supply & Electrification Works at Hazi Rashid Ali High School, Dakshin Surma, Sylhet. (FY: 2021-22)
37.07.0000.014.20.101.23-2854(13)
|
Office of the Executive Engineer, Education Engineering Department, Sylhet |
11/09/2023 |
21/08/2025
12:00 PM
|
Sylhet |